Tuesday, August 7, 2012

Back pieced

I was going to work on some more hand quilting last night but C was upset I wasn't working on her quilt.  Alrighty then.

I don't have enough batting for her quilt (good thing there's a sale at Jo-Ann) so I worked on piecing the back.  I could have just used the backing joined together since I had enough but I wanted to use the scraps I had from the top though.  I kept the large pieces leftover from the Amy Butler fabrics she picked out and I added smaller scraps to them to fill in the spaces.  I got the back pieced and pressed while watching the Olympics last night and I'll get the batting tonight.  The plan for tonight, making the sandwich maybe and contemplating the quilting a little more.  A trip to the thread store might have to wait until this weekend after my race, we'll see.

Sunday, August 5, 2012

C's top is done

And in record time. It felt great to get back to sewing after being on vacation.

Friday, July 20, 2012

Finished

Binding it tonight.

And just like that, done quilting

Two very good nights, lots of stopping due to empty bobbins but I think I've finally got the hang of this FMQ thing. I finished P's quilting last night, I even wrote her name in the corner. Tonight it's trimming and sewing on the binding. I'll add an iPod picture tonight hopefully. Next up, laying out C's blocks and sewing the top together.

Sunday, July 15, 2012

So far behind

I know I haven't blogged in a while.  It's because I haven't sewn in a while.

I do have something to share today though.

From a display at my local fabric store.

I kinda want to find a project for it.

Thursday, June 14, 2012

Thought I had forgotten about sewing?

Nah, I just have 237 other things on my plate right now. I'm now two weeks overdue in getting fabric out to my MoM quilt bee. Here's just a snipet. This is a quilt for M man but it will be a while before I can get to quilting it.